You are viewing the public-access application as a member of the public. In order to view data specific to your insurer group, please log in as an authorized user.


Log In


Back to Dashboard
Class Code Information

Phraseology

Dam or Lock Construction – Concrete Work – In Connection with Dams or Locks – All Types – All Operations to Completion & Drivers

Description

Code 6017 applies to employers engaged in concrete work that is performed in connection with dams and locks.  This classification includes foundations or the making, setting up or taking down forms, scaffolds, falsework or concrete distribution apparatus.  In addition, it includes dam repair work.  This classification also contemplates temporary concrete batch plant operations at the construction job site when these batch plants are operated by the employer that is engaged in this classification’s construction operations.

Assignment by Analogy

Penstocks – water sluiceway construction – concrete

Operations to be Separately Rated

  1. Caisson work, cofferdam work or shaft sinking.  Refer to Code 6252 “Shaft Sinking – All Operations to Completion.”

  2. Earth moving or placing in connection with dams or locks – all types.  Refer to Code 6018 “Dam or Lock Construction – Earthmoving or Placing – In Connection with Dams or Locks – All Types – All Operations to Completion & Drivers.”

  3. Tunneling - Pneumatic or Not pneumatic.  Refer to Code 6251 “Tunneling – All Operations to Completion.”

Industry Group

Contracting