Public View
Back to Dashboard
Class Code Information
Phraseology
Dam or Lock Construction – Concrete Work – In Connection with Dams or Locks – All Types – All Operations to Completion & DriversDescription
Code 6017 applies to employers engaged in concrete work that is performed in connection with dams and locks. This classification includes foundations or the making, setting up or taking down forms, scaffolds, falsework or concrete distribution apparatus. In addition, it includes dam repair work. This classification also contemplates temporary concrete batch plant operations at the construction job site when these batch plants are operated by the employer that is engaged in this classification’s construction operations.
Assignment by Analogy
Penstocks – water sluiceway construction – concrete
Operations to be Separately Rated
Caisson work, cofferdam work or shaft sinking. Refer to Code 6252 “Shaft Sinking – All Operations to Completion.”
Earth moving or placing in connection with dams or locks – all types. Refer to Code 6018 “Dam or Lock Construction – Earthmoving or Placing – In Connection with Dams or Locks – All Types – All Operations to Completion & Drivers.”
- Tunneling - Pneumatic or Not pneumatic. Refer to Code 6251 “Tunneling – All Operations to Completion.”