You are viewing the public-access application as a member of the public. In order to view data specific to your insurer group, please log in as an authorized user.


Log In


Back to Dashboard
Class Code Information

Phraseology

Pile Driving – NOC – All Operations to Completion & Drivers
Note:  

Includes timber wharf building.

Description

Code 6003 applies to employers engaged in operations of pile driving.  Piles are long, heavy pillars made of timber, metal, pipe or concrete.  Piles are driven into earth to support all types of structures including bridges and buildings.  The pile foundation balances the weight of the underlying rock or soil surfaces.  The piles are used for various construction projects where foundations are required to be deep such as buildings, tunnels, bridges, wharves, docks, etc.

Assignment by Analogy

Breakwater or Jetty Construction – sea walls of concrete piles

Operations to be Separately Rated

  1. Breakwater or jetty construction – no caisson, cofferdam or pile driving work, dike or revetment – construction, or dock building – no pile driving.  Refer to Code 6005 “Breakwater or Jetty Construction – All Operations to Completion & Drivers.” 

Industry Group

Contracting